Poplar Bluff Regional Medical Center

  • 2,535 Tons of Steel
  • 85,000 Shear Studs installed
  • 440,000 Sq. Ft.

What we did

Sentry worked with contractor M.J. Harris and fabricator Wylie Steel to complete construction of the replacement hospital at Poplar Bluff Regional Medical Center in Poplar Bluff, Missouri in less than 15 months. The total time for design and construction was only 18 months – half of the time typically needed for a project of this magnitude.

The state-of-the-art, 250-bed facility is situated on a 64-acre campus in southeastern Missouri, and the new 8-story hospital totals more than 425,000 square feet.

Services used: