Wastewater Treatment Plant

Sentry provided Crane Services, Riggers and an Engineered Platform to perform several lifts at a local wastewater treatment plant that included transformers, switchgear and UPS cabinets that were installed on multiple floors within the building and around the exterior.

Division: Crane Rental
Location: Madison, TN
Client / General Contractor: Stansell Electric
Project Type: Industrial
Scope of Work: Proivded Crane Service, Riggers and Engineered Platform 
Start Date: January 2026
Completion Date: May 2026
Project Size: N/A
Equipment Used: 110 Ton Hydraulic Truck Crane, Engineered Lifting Platform